Tutors Mike, Ian, Peter, Dennis, Steve, Rory, Des, Rob, Dave and of course, our longest running ‘candidate/tutor’, Cath. Those that passed were Don ZL3SDD, John ZL3JDR, Hugh ZL1BOM, Ian ZL3IR, Glenn ZL3MTN, Bryan ZL3BHS, Michael ZL3MDG and Paul ZL3PEB.
Mt Grey Fusion Repeater Installation – September 2020
After meeting at lake Janet at 11:30am 2 four-wheel drives and Geoff in his small car headed up the 5km 15 min drive up to the Kordia tower. After arriving at the top at 1155 and checking out the views Richard ZL4FZ then gained access to the building and then with the help of mainly...
ZL3CC SOTA Memorial Day – 12th September 2020
Saturday 12th September saw six ZL3 activators ascend eight separate summits on Banks Peninsula & Zl3X/ZL3AB up in the Hanmer region. The mountain goats were: Geoff, ZL3GA was the cab off the rank & very quickly was able to get his 4+ contacts & was met by ZL3RIK who was taking over Flag Peak while...
50MHz Beam Antenna – August 2020
The club built a kitset 4 Element 50ohm Yagi with 2.2m Boom.Based on a DK7ZB design https://www.qsl.net/dk7zb/6m/428-breit.htm (bottom of page) Medium bandwidth, high gain design with a gain of 6.8dBd and F/B ratio of lSdB Design will be built with 25mm/lin square boom, with 9.35mm/¾in elements. Elements will have 12.7mm / ½in centre sections for...
Workshop Worries – July 2020
We arrived at clubroom at 9am on 9th July 2020. The workshop was flooded again, 2nd time in two weeks. We explored outside, to discover that the problem persists. Previous attempt to move bricks and loosen up the dirt has just ended up with saturated ground, and more flooding. Pick up the phone and call...
HamCram – June 2020
HamCram exam on Sunday 14th June. All passed.Tutors, Mike, Steve, Don, Richard, Dave and Cath.
Lockdown Projects – May 2020
Gilbert ZL3GIL During the lockdown I had time to finish off my BITX20 usb transceiver. This was one of my decade-long projects… I’d bought the pcbs & inductor cans off Sunil Lakhani VU3SUA around the time of the 2010- 2011 earthquakes and a bag of 10MHz crystals for the IF from one of our local...
Mt. Herbert Maintenance Trip – May 2020
Antenna replacement with a folded dipole as the main antenna on the pole has been damaged and water is in the coax cable.Steve ZL2UCX and Richard ZL4FZ climbed the tower with the 1st climb last 75 minutes and the 2nd climb lasted 45 minutes. It was cold with a nor-easterly wind and visibility was less...
SOTA Report – May 2020
With the Covid 19 virus lockdown reduced to level 2 that meant that the SOTA programme was back on track & the mountain goats were let out of their enforced confinement. May 16th saw 5 intrepid activators brave the early morning ground fog that lay in patches in the city & climb various summits. Four...